Consolidation of Bridge Dona
Consolidation of Bridge Dona Local Ponteceso - Coristanco (A Coruña - Spain) Year 2010 What have we improved?
  • Masonry reinforcement
  • Piers internal fill up
< back to projects
 

Consolidation of Bridge Dona

During the winter of 2009 the bridge was damaged by heavy floods, which affected mainly the piers, with takedowns and loss of an important part of their factory, which caused the collapse of one of its openings.

In 2010, some works were undertaken urgent interim consolidation and strengthening the masonry of the bridge, through the implementation of massive internal piers ruined grouting at rest and reinforcement through metal bound with cables and cross sections.

Contact us E.I.C. DURÁN, S.L.
Civil Engineering Firm
  • +34 988 239 271
  • info@eicduran.com
  • Barros Sibelo 1
    left ground floor,
    32004 Ourense (Spain)
see on map


E.I.C. DURÁN, S.L. Civil Engineering Firm

E.I.C. DURÁN, S.L.
Civil Engineering Firm

  • Barros Sibelo 1, bajo izquierda 32004 Ourense (Ourense)
  • +34 988 239 271
  • info@eicduran.com

web design NectoDigital