Repair Bridge Gatín
Repair Bridge Gatín Local Becerreá (Lugo - Spain) Year 2009 What have we improved?
  • Retacado y grountig
  • New pavement
  • Cutwater reconstruction
< back to projects
 

Repair Bridge Gatín

The work, conducted in 2009 included the removal of vegetation from the bridge, with a shotgun and grouting with lime mortar in areas with lack of material, rebuilt the seawall and the spur of masonry mortar schist taken hydraulic lime, and renewed the deteriorated pavement with a new one made ​​with pieces of slate arranged song (chapacuña), on a mass concrete.

The bridge is in use and is transited, mainly by agricultural vehicles. The work topped the repair and reconstruction of existing masonry parapets.

Contact us E.I.C. DURÁN, S.L.
Civil Engineering Firm
  • +34 988 239 271
  • info@eicduran.com
  • Barros Sibelo 1
    left ground floor,
    32004 Ourense (Spain)
see on map


E.I.C. DURÁN, S.L. Civil Engineering Firm

E.I.C. DURÁN, S.L.
Civil Engineering Firm

  • Barros Sibelo 1, bajo izquierda 32004 Ourense (Ourense)
  • +34 988 239 271
  • info@eicduran.com

web design NectoDigital