Repair Bridge ofPuntaleiras
Repair Bridge ofPuntaleiras Local As Neves (Pontevedra - Spain) Year - What have we improved?
  • Strengthening the vault
  • Renewal of pavemen
  • Replacement railings
  • Tamping and replacement of pieces
< back to projects
 

Repair Bridge ofPuntaleiras

The most important action consisted in strengthening the stability of the vault, then had a deformation (flattening of the arch) with subsequent hinge, which reduced the recommended safety factor to a value acceptable to a charge equivalent to traffic supported by this bridge. This reinforcement was the formation of a saddle in the vault extrados, with a thread of hydraulic lime concrete thickness specified in the documentation.

The works were complemented by the removal of vegetation from the walls of the bridge, tamping and replacement of worn parts, resurfacing with the pieces recovered from the replacement of existing railings with new ones and existing ones that were a mere stones without in any form, which narrowed the road and did not provide any security.

Contact us E.I.C. DURÁN, S.L.
Civil Engineering Firm
  • +34 988 239 271
  • info@eicduran.com
  • Barros Sibelo 1
    left ground floor,
    32004 Ourense (Spain)
see on map


E.I.C. DURÁN, S.L. Civil Engineering Firm

E.I.C. DURÁN, S.L.
Civil Engineering Firm

  • Barros Sibelo 1, bajo izquierda 32004 Ourense (Ourense)
  • +34 988 239 271
  • info@eicduran.com

web design NectoDigital