Transfer of the Bridge Irixo
Transfer of the Bridge Irixo Local Irixo (Ourense - Spain) Year 2001 What have we improved?
  • Medieval masonry recovery
< back to projects
 

Transfer of the Bridge Irixo

works carried out in 2001, consisted of recovery of the whole medieval masonry preserved of the bridge -two arches and a medieval ridged cross section that was numbered and later collected neatly reassembled on the new site chosen. It held its total reconstruction distinctly different stone materials to the original.

Contact us E.I.C. DURÁN, S.L.
Civil Engineering Firm
  • +34 988 239 271
  • info@eicduran.com
  • Barros Sibelo 1
    left ground floor,
    32004 Ourense (Spain)
see on map


E.I.C. DURÁN, S.L. Civil Engineering Firm

E.I.C. DURÁN, S.L.
Civil Engineering Firm

  • Barros Sibelo 1, bajo izquierda 32004 Ourense (Ourense)
  • +34 988 239 271
  • info@eicduran.com

web design NectoDigital